WAC Notes August 31 2020

From PREX Wiki
Jump to navigationJump to search
Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 30 2020 << >> WAC Notes September 1 2020

August 31 2020

Daily Meeting BlueJeans

Production Run List - Slug 208 - IHWP IN - Flip-RIGHT - Production

we started slug 208 (delayed until IHWP flip happens) after slug 206, when slug 207 has finished before, so slug 207 and 208 have the same IHWP state

Non-Production Runs and Bad Runs

  • Junk - run 8139-8141 -- trying to restore beam

Issues

  • beam was quite unstable, we have to go down to 135 uA
  • Hall C failed to change pass due to problem in their target, so we come back to production in a rush.

Updates