Difference between revisions of "WAC Notes August 30 2020"
From PREX Wiki
Jump to navigationJump to searchLine 27: | Line 27: | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8107_000 Run 8107] -- Unser Scan | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8107_000 Run 8107] -- Unser Scan | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8109_000 Run 8109] -- Pedestal Scan | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8109_000 Run 8109] -- Pedestal Scan | ||
− | |||
* NeedCut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8111_000 Run 8111] -- Aq feedback was turned off in the first few minutes | * NeedCut - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8111_000 Run 8111] -- Aq feedback was turned off in the first few minutes | ||
* Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8112_000 Run 8112] | * Good - [https://prex.jlab.org/analysis/crex/index.php?run=summary/all/run8112_000 Run 8112] |
Latest revision as of 21:43, 1 September 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 29 2020 << >> WAC Notes August 31 2020
August 30 2020
Daily Meeting BlueJeans
Production Run List - Slug 207 - IHWP IN - Flip-RIGHT - Production
- Good - Run 8104
- Good - Run 8105
- Good - Run 8106
- Good - Run 8107 -- Unser Scan
- Good - Run 8109 -- Pedestal Scan
- NeedCut - Run 8111 -- Aq feedback was turned off in the first few minutes
- Good - Run 8112
- Good - Run 8113
- Good - Run 8114
- Good - Run 8115
- Good - Run 8116
- Good - Run 8117
- Good - Run 8118
- Good - Run 8119
Production Run List - Slug 206 - IHWP OUT - Flip-RIGHT - Production
- Good - Run 8120
- Good - Run 8121
- Good - Run 8123
- Good - Run 8124
- Good - Run 8125
- Good - Run 8126
- Good - Run 8127
- Good - Run 8128 -- run 8128 - 8130 are included in slug 206, rather than next slug: 208, because there was no IHWP flip.
- Good - Run 8129
- Good - Run 8130 -- actually happened on Aug, 31. I just leave it here because it ends slug 206
Non-Production Runs and Bad Runs
- Junk - Run 8006 -- C-1%
- Junk - run 8007- 8011
Issues
- larger beam energy, which results in ~3.5 mm more acceptance in detector: https://logbooks.jlab.org/entry/3838447, that's also why Devi moved the detector