Difference between revisions of "WAC Notes August 31 2020"

From PREX Wiki
Jump to navigationJump to search
Line 36: Line 36:
  
 
== Issues ==
 
== Issues ==
 +
* Hall C failed to change pass due to problem in their target, so we come back to production in a rush.
  
 
== Updates ==
 
== Updates ==
  
 
[[Category:WAC]]
 
[[Category:WAC]]

Revision as of 23:25, 31 August 2020

Documentation
HOW TOs for shift crew
Expert Tools
All Expert Contacts



PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions

WAC Notes August 30 2020 << >> WAC Notes September 1 2020

August 31 2020

Daily Meeting BlueJeans

Production Run List - Slug 208 - IHWP OUT - Flip-RIGHT - Production

Non-Production Runs and Bad Runs

  • Junk - Run 8006 -- C-1%
  • Junk - run 8007- 8011

Issues

  • Hall C failed to change pass due to problem in their target, so we come back to production in a rush.

Updates