Difference between revisions of "WAC Notes August 31 2020"
From PREX Wiki
Jump to navigationJump to search (→Issues) |
|||
Line 36: | Line 36: | ||
== Issues == | == Issues == | ||
+ | * Hall C failed to change pass due to problem in their target, so we come back to production in a rush. | ||
== Updates == | == Updates == | ||
[[Category:WAC]] | [[Category:WAC]] |
Revision as of 23:25, 31 August 2020
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes August 30 2020 << >> WAC Notes September 1 2020
August 31 2020
Daily Meeting BlueJeans
Production Run List - Slug 208 - IHWP OUT - Flip-RIGHT - Production
- Good - Run 8131
- Good - Run 8132
- Good - Run 8133
- Good - Run 8134
- Good - Run 8135
- Good - Run 8136
- Good - Run 8137
- Good - Run 8138
Non-Production Runs and Bad Runs
- Junk - Run 8006 -- C-1%
- Junk - run 8007- 8011
Issues
- Hall C failed to change pass due to problem in their target, so we come back to production in a rush.