WAC Notes March 4 2020
From PREX Wiki
Revision as of 14:16, 6 March 2020 by Ajzec (talk | contribs) (Created page with "{| cellpadding=5 style="margin:7px 30px 0 30px; <!-- --> float:right; border:1px solid #AA6633" |- bgcolor="#fbfeff" |- |Documentation |- | HOW TOs | HOW TOs for shif...")
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
Documentation |
HOW TOs for shift crew |
Expert Tools |
All Expert Contacts |
PREX Main << Weekly Analysis Coordinator << WAC Notes CREX << Instructions
WAC Notes March 3 2020 << >> WAC Notes March 5 2020
March 4 2020
Daily Meeting BlueJeans
Production Run List - Slug 152 - IHWP IN - Flip-LEFT - Production
Slug started on March 4 at approx. 2 AM.
- Good - Run 6889
- High Aq widths, above 700 ppm. Applies to all runs before injector steering.
- Good - Run 6890
- Y BPMs correlated with 12X.
- Good - Run 6891
- Good - Run 6892
- Good - Run 6893
- High Aq mean, even with widths
- Good - Run 6894
- Good - Run 6895
- Good - Run 6896
- Runs 6897 - 6908 are junk for injector + beam studies
- Good - Run 6909
- Good - Run 6910
- Good - Run 6913
- Good - Run 6914
- Good - Run 6915
- Good - Run 6916
Non-Production Runs and Bad Runs
- Runs 6897 - 6908
- Down for beam tuning, injector work, and recovery
- Run 6911
- Has 150 uA current, but marked as Bad because no EventCut passing events
- Run 6912
- Down for further injector steering