** If not open, see [[Alarm Handler]] | ** If not open, see [[Alarm Handler]] | ||
* Is the volume up on hacweb7? (both hardware and software) | * Is the volume up on hacweb7? (both hardware and software) | ||
− | + | <B>Hall A Tools</B> and related menu screens: | |
− | |||
* Beam Energy (GeV) | * Beam Energy (GeV) | ||
* Beam current (µA) | * Beam current (µA) |
Revision as of 15:22, 12 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< Information for Shift Takers << Shift Leader << Shift Checklist
- Is alarm handler running on hacweb7?
- If not open, see Alarm Handler
- Is the volume up on hacweb7? (both hardware and software)
Hall A Tools and related menu screens:
- Beam Energy (GeV)
- Beam current (µA)
- Downstream raster (B) on? Yes/No
- Raster size (x:y mm, see log 3654466 )?
- Fast feedback on? Yes/No
- Beam Position Monitor X/Y (mm) A
- Beam Position Monitor X/Y (mm) E (BPM B in Hall A Tools)
- BCM temperature (K) (PV, PS, Thermocouple) If these differ by +/-.5 from (110.0,110.0,115.0) (Fahrenheit) contact RC and halog
- These temperature readbacks are located in the middle DAQ room, in rack CH0B06 (far left) at the very top
- It is important that these temperatures stay stable within 0.5 Fahrenheit or else the BCM current readout will become uncalibrated
- Arc energy NMR locked? ( (Goto ARC or the "Field Management Screen", and verify if the box locked is ON/OFF))
- VESDA System OK? (VESDA is the smoke/fire detection and alarm system. Check the Hall A VESDA Console on the wall behind the door
- Current Target
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)
- Visual Hall Inspection OK?
- SAM HV
- Upstream/downstream corrector currents (A) ?
- Septum current (A) and polarity?