Difference between revisions of "Beam and Hall checks"

From PREX Wiki
Jump to navigationJump to search
Line 7: Line 7:
 
[[File:Raster_bad.jpg|thumb|600px|right|Figure 3 - A picture of the scope when the raster is off.  This would be BAD if beam were on!]]
 
[[File:Raster_bad.jpg|thumb|600px|right|Figure 3 - A picture of the scope when the raster is off.  This would be BAD if beam were on!]]
 
[[File:BCM_temps.jpg|thumb|600px|right|Figure 4 - Picture of the BCM temperature readout in the computer room.]]
 
[[File:BCM_temps.jpg|thumb|600px|right|Figure 4 - Picture of the BCM temperature readout in the computer room.]]
[[File:Halltools_gas.png|thumb|600px|right|Figure 5 - The gas section in the Hall A Tools window.]]
+
[[File:Fast_feedback_off.png|thumb|600px|right|Figure 5 - Snapshot of the Fast Feedback Controls when the FFB is <b>OFF</b>.]]
[[File:Halltools_other.png|thumb|600px|right|Figure 6 - Camera and alignment info in the Hall A Tools window.]]
+
[[File:Halltools_gas.png|thumb|600px|right|Figure 6 - The gas section in the Hall A Tools window.]]
[[File:VESDA.jpg|thumb|600px|right|Figure 7 - The VESDA panel in the counting house.]]
+
[[File:Halltools_other.png|thumb|600px|right|Figure 7 - Camera and alignment info in the Hall A Tools window.]]
[[File:Camera_location.jpg|thumb|600px|right|Figure 8 - Where you can find the camera display and the controls in the counting house.]]
+
[[File:VESDA.jpg|thumb|600px|right|Figure 8 - The VESDA panel in the counting house.]]
[[File:Camera_controls.jpg|thumb|600px|right|Figure 9 - The camera controls.]]
+
[[File:Camera_location.jpg|thumb|600px|right|Figure 9 - Where you can find the camera display and the controls in the counting house.]]
 +
[[File:Camera_controls.jpg|thumb|600px|right|Figure 10 - The camera controls.]]
  
  
Line 57: Line 58:
 
=== Gasses ===
 
=== Gasses ===
  
* Pressures (see Figure 5)
+
* Pressures (see Figure 6)
 
** Argon pressure (psi)
 
** Argon pressure (psi)
 
** Ethane pressure (psi)
 
** Ethane pressure (psi)
 
** CO2 pressure (psi)
 
** CO2 pressure (psi)
* VESDA System OK? (see Figure 7)
+
* VESDA System OK? (see Figure 8)
 
** VESDA is the smoke/fire detection and alarm system
 
** VESDA is the smoke/fire detection and alarm system
 
** Check the Hall A VESDA Console on the wall behind the door
 
** Check the Hall A VESDA Console on the wall behind the door
Line 69: Line 70:
 
=== Hall/Counting House ===
 
=== Hall/Counting House ===
  
* Visual Hall Inspection OK? (see Figure 8)
+
* Visual Hall Inspection OK? (see Figure 9)
** Make sure to move the camera around and zoom in (See Figure 9)
+
** Make sure to move the camera around and zoom in (See Figure 10)
 
** when complete, zoom all the way back out  
 
** when complete, zoom all the way back out  
 
* Current Target (snapshot)
 
* Current Target (snapshot)

Revision as of 10:41, 18 June 2019

In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.

PREX Main<< Information for Shift Takers << Shift Leader << Shift Checklist

Figure 1 - Alarm handler window when there is a red alarm. If nothing is alarming, it would be grey.
Figure 2 - The beeamline section in the Hall A Tools window.
Figure 3 - A picture of the scope when the raster is off. This would be BAD if beam were on!
Figure 4 - Picture of the BCM temperature readout in the computer room.
Figure 5 - Snapshot of the Fast Feedback Controls when the FFB is OFF.
Figure 6 - The gas section in the Hall A Tools window.
Figure 7 - Camera and alignment info in the Hall A Tools window.
Figure 8 - The VESDA panel in the counting house.
Figure 9 - Where you can find the camera display and the controls in the counting house.
Figure 10 - The camera controls.




Alarm Handler

  • Is alarm handler running on hacweb7?
    • On hacweb 7, you should see a window in the upper right corner of the screen
      • Look first in the "Alarm Handler" desktop to see if it is there
      • Check all the windows if not
    • If not open, see Alarm Handler
  • Is the volume up on hacweb7? (both hardware and software)


Hall A Tools and related menu screens

Beamline

  • Beam Energy (GeV) (see Figure 2)
  • Beam Current (µA)
  • Beam Position Monitor (BPM) X/Y (mm) A
  • Beam Position Monitor (BPM) X/Y (mm) E (Called BPM B in Hall A Tools)


  • Downstream raster (B) on? Yes/No (upstream raster is not in use)
    • when raster is off, looks like Figure 3
    • when raster is on, something like halog 3654466
  • BCM temperature (K) (PV, PS, Thermocouple)
    • If these differ by +/-.5 from (110.0, 110.0, 115.0) (Fahrenheit) contact RC and halog
    • These temperature readbacks are located in the middle DAQ room, in rack CH0B06 (far left) at the very top (see Figure 4)
    • It is important that these temperatures stay stable within 0.5 Fahrenheit or else the BCM current readout will become uncalibrated
  • Raster size (x:y mm, see log 3654466)?
  • Fast feedback (FFB) on? Yes/No
    • To check whether the FFB is on or off
      • in a terminal window, type JMenu
      • search for "fast"
      • Choose "Fast Feedback Control" (see Figure , which is for FFB OFF)
      • The status is indicated by the button that is depressed (OFF and RUN in the figure)
    • FFB should be ON during normal production running!
    • However, FFB will be paused during beam modulation
  • Arc energy NMR locked?
    • Go to ARC or the "Field Management Screen"
    • Verify if the box locked is ON/OFF

Gasses

  • Pressures (see Figure 6)
    • Argon pressure (psi)
    • Ethane pressure (psi)
    • CO2 pressure (psi)
  • VESDA System OK? (see Figure 8)
    • VESDA is the smoke/fire detection and alarm system
    • Check the Hall A VESDA Console on the wall behind the door


Hall/Counting House

  • Visual Hall Inspection OK? (see Figure 9)
    • Make sure to move the camera around and zoom in (See Figure 10)
    • when complete, zoom all the way back out
  • Current Target (snapshot)
  • Septum current (A) and polarity?
  • Upstream/downstream corrector currents (A) ?




Next in checklist >> Parity Checks