Difference between revisions of "Beam and Hall checks"
From PREX Wiki
Jump to navigationJump to searchm (→Beamline) |
|||
Line 36: | Line 36: | ||
* Beam Position Monitor (BPM) X/Y (mm) E (Called BPM B in Hall A Tools) | * Beam Position Monitor (BPM) X/Y (mm) E (Called BPM B in Hall A Tools) | ||
<br> | <br> | ||
− | * Downstream raster (B) on? Yes/No | + | * Downstream raster (labelled B or 2, US raster is not in use) on? |
+ | ** Check the Oscilloscope in Counting House Middle Room: Yes/No | ||
** when raster is off, looks like Figure 3 | ** when raster is off, looks like Figure 3 | ||
** when raster is on, something like halog [https://logbooks.jlab.org/entry/3654466 3654466] | ** when raster is on, something like halog [https://logbooks.jlab.org/entry/3654466 3654466] | ||
− | |||
− | |||
− | |||
− | |||
* Raster size (x:y mm, see log [https://logbooks.jlab.org/entry/3654466 3654466])? | * Raster size (x:y mm, see log [https://logbooks.jlab.org/entry/3654466 3654466])? | ||
* Fast feedback (FFB) on? Yes/No | * Fast feedback (FFB) on? Yes/No | ||
Line 52: | Line 49: | ||
** FFB should be <b>ON</b> during normal production running! | ** FFB should be <b>ON</b> during normal production running! | ||
** However, FFB will be paused during beam modulation | ** However, FFB will be paused during beam modulation | ||
− | * Arc | + | * BCM temperature (K) (PV, PS, Thermocouple) |
− | ** Go to | + | ** If these differ by +/-.5 from (110.0, 110.0, 115.0) (Fahrenheit) <b>contact RC and halog</b> |
+ | ** These temperature readbacks are located in the middle DAQ room, in rack CH0B06 (far left) at the very top (see Figure 4) | ||
+ | ** It is important that these temperatures stay stable within 0.5 Fahrenheit or else the BCM current readout will become uncalibrated | ||
+ | * Accelerator Arc Beam Energy NMR locked? | ||
+ | ** Go to "Energy Lock GUI" from JMenu -> Applications section -> "Energy Locks" | ||
** Verify if the box locked is ON/OFF | ** Verify if the box locked is ON/OFF | ||
Revision as of 19:45, 23 June 2019
In the process of editing and updating this page. Please contact Juliette Mammei crowder@jlab.org with questions or suggestions.
PREX Main<< Information for Shift Takers << Shift Leader << Shift Checklist
Alarm Handler
- Is alarm handler running on hacweb7?
- On hacweb 7, you should see a window in the upper right corner of the screen
- Look first in the "Alarm Handler" desktop to see if it is there
- Check all the windows if not
- If not open, see Alarm Handler
- On hacweb 7, you should see a window in the upper right corner of the screen
- Is the volume up on hacweb7? (both hardware and software)
Beamline
- Beam Energy (MeV) (see Figure 2)
- Beam Current (µA)
- Beam Position Monitor (BPM) X/Y (mm) A
- Beam Position Monitor (BPM) X/Y (mm) E (Called BPM B in Hall A Tools)
- Downstream raster (labelled B or 2, US raster is not in use) on?
- Check the Oscilloscope in Counting House Middle Room: Yes/No
- when raster is off, looks like Figure 3
- when raster is on, something like halog 3654466
- Raster size (x:y mm, see log 3654466)?
- Fast feedback (FFB) on? Yes/No
- To check whether the FFB is on or off
- in a terminal window, type JMenu
- search for "fast"
- Choose "Fast Feedback Control" (see Figure 5, which is for FFB OFF)
- The status is indicated by the button that is depressed (OFF and RUN in the figure)
- FFB should be ON during normal production running!
- However, FFB will be paused during beam modulation
- To check whether the FFB is on or off
- BCM temperature (K) (PV, PS, Thermocouple)
- If these differ by +/-.5 from (110.0, 110.0, 115.0) (Fahrenheit) contact RC and halog
- These temperature readbacks are located in the middle DAQ room, in rack CH0B06 (far left) at the very top (see Figure 4)
- It is important that these temperatures stay stable within 0.5 Fahrenheit or else the BCM current readout will become uncalibrated
- Accelerator Arc Beam Energy NMR locked?
- Go to "Energy Lock GUI" from JMenu -> Applications section -> "Energy Locks"
- Verify if the box locked is ON/OFF
Gasses
- Pressures (see Figure 6)
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)
- VESDA System OK? (see Figure 8)
- VESDA is the smoke/fire detection and alarm system
- Check the Hall A VESDA Console on the wall behind the door
Hall/Counting House
- Visual Hall Inspection OK? (see Figure 9)
- Make sure to move the camera around and zoom in (See Figure 10)
- when complete, zoom all the way back out
- Current Target (snapshot)
- Septum current (A) and polarity?
- Upstream/downstream corrector currents (A) ?
Next in checklist >> Parity Checks