Alarm Handler
- VESDA System OK? (see Figure 8)
- VESDA is the smoke/fire detection and alarm system
- Check the Hall A VESDA Console on the wall behind the door
- Every light should be green and in the minimum lowest alert setting.
- Is alarm handler running on hacweb7?
- On hacweb 7, you should see a window in the upper right corner of the screen
- Look first in the "Alarm Handler" desktop to see if it is there
- Check all the windows if not
- If not open, see Alarm Handler
- On hacweb 7, you should see a window in the upper right corner of the screen
- Is the volume up on hacweb7? (both hardware and software)
- Go to Alarm Hall A Alarm Handler -> Setup -> Test Beep Sound
Beamline
- Visual Hall Inspection OK? (see Figure 9)
- Make sure to move the camera around and zoom in (See Figure 10)
- when complete, zoom all the way back out
- Beam Energy (MeV) (see Figure 2)
- Beam Current (µA)
- Current Target (45 degree ladder/90 degree ladder)
- See Target GUI on Target computer
- Or JMenu -> Search for Target GUI -> "Hall A Target Lifter" and it has the same information (as well as raster and other useful information)
- Are the Hall A Target position slow locks functioning? - Should be locked during Parity Production
- JMenu -> Search for Orbit Lock -> Select "Orbit Locks Normal View"
- If HallATGT is Green and Lock Status = Running then the slow locks are enabled
- Beam Position Monitor (BPM) X/Y (mm) A
- Beam Position Monitor (BPM) X/Y (mm) E (Called BPM B in Hall A Tools)
- Downstream raster (labelled B or 2, US raster is not in use) on?
- Check the Oscilloscope in Counting House Middle Room: Yes/No
- when raster is off, looks like Figure 3
- when raster is on, something like halog 3654466
- Raster size (x vs. y in mm)?
- You can also check with the JMenu -> Hall A Fast Raster screen
- Fast feedback (FFB) on? Yes/No - should be on during Parity Production
- The easiest check is to look at the FFB information in bottom left corner of Hall A General Tools
- An additional way to check whether the FFB is on or off:
- in a terminal window, type JMenu
- search for "fast"
- Choose "Fast Feedback Control" (see Figure 5, which shows the upper left corner when FFB is OFF)
- The status is indicated by the button that is depressed (OFF and RUN in the figure)
- Do not use any of the Hall A Fast Feedback Control menus other than the "Fast Feedback Control" one. The screen should be small and have Hall A and C on it. You should NOT be able to edit any of the parameters.
- FFB should be ON during normal production running!
- However, FFB will be paused during beam modulation
- BCM temperature (K) (PV, PS, Thermocouple)
- These temperature readbacks are located in the middle DAQ room, in rack CH0B06 (far left) at the very top (see Figure 4)
- If these differ by +/-.5 from (110.0, 110.0, 115.0) (Fahrenheit) contact RC and halog
- It is important that these temperatures stay stable within 0.5 Fahrenheit or else the BCM current readout will become uncalibrated
- Accelerator Arc Beam Energy NMR locked?
- Go to "Energy Lock GUI" from JMenu -> Applications section -> "Energy Locks"
- Verify if the box locked is ON/OFF - should be on during Parity Production
- If the 3 "OR", "1A", and "2A" lights are green then the energy is locked
Hall Status
- Are the Compton Background Rates sufficiently low (<10kHz)?
- JMenu -> Plots -> MyaPlot -> Right Click and Load a Configuration -> Select PREX in Directories -> Compton Background Rates -> Ok Move to Now
- If you see anything above 10kHz in any of the strip charts, this is bad, and the Compton Expert on shift should be notified
- Is the Compton DAQ running? (It should be during Parity Production)
- Ask the Compton expert on shift
- Is the Compton Photon Detector PMT High Voltage on? (It should be during Parity Production)
- Look at the Low Voltage power supply, it is at the bottom of the electronics rack CH01B00 in the middle DAQ Counting House room.
- It is a small box with a banana plug -> BNC cable plugged into it
- The Voltage should read approximately 5.3 Volts
- Is the Moller Polarimeter within operational temperature limits? See Figure 11 for reference or Simona's elog entry
- The screen can be obt ained through: NewTools -> JMenu -> "Moller Polarimeter Temperature Monitor" -> Hall A Moller Temperature
- The optimal points are: Cryocooler (T1) ~ 3K, Magnet (T2) ~3K, Magnet Lead #1 ~40K, Magnet Lead #2 ~ 40K
- If something happens for the Moller Polarimeter, Call Simona
- Septum current (A) and polarity? Matches whiteboard set-point?
- JMenu -> Search for Big Bite Septum or Hall A Septum
- Before adjusting septum please read and sign the septum OSP document (in the yellow OSP folder)
Gasses
- Pressures (see Figure 6)
- Argon pressure (psi)
- Ethane pressure (psi)
- CO2 pressure (psi)