Difference between revisions of "DAQ Layouts"

From PREX Wiki
Jump to navigationJump to search
(Created page with "Further information is available in DAQ Documentation Portal and DAQ Testing Portal Maps and layout schematics of the various DAQ systems r...")
 
 
(14 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
Further information is available in [[DAQ_Doc_Portal|DAQ Documentation Portal]] and [[DAQ_Testing|DAQ Testing Portal]]
 
Further information is available in [[DAQ_Doc_Portal|DAQ Documentation Portal]] and [[DAQ_Testing|DAQ Testing Portal]]
  
Maps and layout schematics of the various DAQ systems relevant for running Hall A Parity experiments
+
Maps and layout schematics of the various DAQ systems relevant for running Hall A Parity experiments.
 +
 
 
See also - [[DAQ Commissioning Notes]], [[DAQ Testing]]
 
See also - [[DAQ Commissioning Notes]], [[DAQ Testing]]
 
== Hall A Counting House Parity DAQ ==
 
== Hall A Counting House Parity DAQ ==
 +
=== UPDATE 7/5/2019 ===
 +
I changed the timing a bit, put back to 1024 after we had been in beam synch 1021 num_samples. Made sure the timebrd integration gate matches: https://logbooks.jlab.org/entry/3698934. The DocDB timing diagram has been updated with this timing information now too, and [[:media:Timing_Diagram_07052019.pdf|here is the wiki .pdf copy]].
 +
 +
=== 6/12/2019 ===
 +
[[:media:Parity-DAQ-6-12-2019.pdf|Timing diagrams and P2P maps of CH and RHS crates]], [[:media:Channel-Map.pdf|Channel Maps]], [[:media:TimingDiagrams.pdf|Timing Diagrams]]
 +
 +
=== 4/4/2019 ===
 +
A point to point map from April 4th 2019 is [[:media:DAQ-Documentation-4-4-2019.pdf|here]].
 +
=== 2/20/2019 ===
 +
The counting house Beamline Monitoring DAQ layout is (February 20th) documented in [https://ace.phys.virginia.edu:80/HAPPEX/3603 HAPLOG 3603]
  
 
== Injector DAQ ==
 
== Injector DAQ ==
 +
=== Injector Timing Diagram ===
 +
==== Current ====
 +
See [[DAQ_Testing/20181106|DAQ Testing 11-6-2018]]
 +
 +
==== Old ====
 +
[[image:Injector_helicity.png|Injector_helicity.png]]
 +
* August 10th 2018 - [[media:Injector_helicity.png|Injector_helicity.png]] - see [[DAQ Meeting/20180810|DAQ Meeting 8-10-2018]]
 +
* August 1st 2018 - [[media:Injector_helicity_old.png|Injector_helicity_old.png]]
  
 
== L/RHRS DAQ ==
 
== L/RHRS DAQ ==

Latest revision as of 13:41, 8 July 2019

Further information is available in DAQ Documentation Portal and DAQ Testing Portal

Maps and layout schematics of the various DAQ systems relevant for running Hall A Parity experiments.

See also - DAQ Commissioning Notes, DAQ Testing

Hall A Counting House Parity DAQ

UPDATE 7/5/2019

I changed the timing a bit, put back to 1024 after we had been in beam synch 1021 num_samples. Made sure the timebrd integration gate matches: https://logbooks.jlab.org/entry/3698934. The DocDB timing diagram has been updated with this timing information now too, and here is the wiki .pdf copy.

6/12/2019

Timing diagrams and P2P maps of CH and RHS crates, Channel Maps, Timing Diagrams

4/4/2019

A point to point map from April 4th 2019 is here.

2/20/2019

The counting house Beamline Monitoring DAQ layout is (February 20th) documented in HAPLOG 3603

Injector DAQ

Injector Timing Diagram

Current

See DAQ Testing 11-6-2018

Old

Injector_helicity.png

L/RHRS DAQ

Moller Polarimeter DAQ

Compton Polarimeter DAQ