Difference between revisions of "HOW TOs"

From PREX Wiki
Jump to navigationJump to search
Line 6: Line 6:
  
 
* Ask the expert (back room) if something is unclear.
 
* Ask the expert (back room) if something is unclear.
* Start / stop runsParity DAQ (apar@adaq1).  Keep runs <430 K events, about 1 hour.
+
* Start / stop runs using the Parity DAQ (apar@adaq1).  Keep runs <430 K events, about 1 hour.
 
* Verify that Charge Asymmetry is running.  The data are practically useless if not.
 
* Verify that Charge Asymmetry is running.  The data are practically useless if not.
 
* Verify that Beam Modulation is running
 
* Verify that Beam Modulation is running

Revision as of 13:01, 19 July 2019

PREX Main<< Information for Shift Takers << Shift Leader


Overview of Shift Tasks

  • Ask the expert (back room) if something is unclear.
  • Start / stop runs using the Parity DAQ (apar@adaq1). Keep runs <430 K events, about 1 hour.
  • Verify that Charge Asymmetry is running. The data are practically useless if not.
  • Verify that Beam Modulation is running
  • Look at the Panguin ("online analyzer") plots
  • Analyze ("fast prompt") each run and review the prompt plots.

Taking Data

Magnets

Target

Detectors

Reporting

Monitoring

Re-initializing

Fall 2016 HOWTO


Expert Tools

Pictures needed