Difference between revisions of "HOW TOs"

From PREX Wiki
Jump to navigationJump to search
Line 42: Line 42:
 
* [https://logbooks.jlab.org/entry/3695570 How to Find the 90-Degree C-Hole]
 
* [https://logbooks.jlab.org/entry/3695570 How to Find the 90-Degree C-Hole]
 
* [[ InsertingTargetProcedure | How to establish beam on a lead target ]]
 
* [[ InsertingTargetProcedure | How to establish beam on a lead target ]]
 +
* [[ ThermalBreakin | Thermally break-in the target in case of long beam down ]]
  
 
== Detectors ==  
 
== Detectors ==  

Revision as of 20:41, 11 December 2019

PREX Main<< Information for Shift Takers << Shift Leader


Overview of Shift Tasks

  • Ask the expert (back room) if something is unclear.
  • Start / stop runs using the Parity DAQ (apar@adaq1). Keep runs <430 K events or ~0.5 hour at 240 Hz.
  • Verify that Charge Asymmetry feedback is running. The data are practically useless if not.
  • Verify that Beam Modulation is running
  • Look at the Panguin ("online analyzer") plots
  • Analyze ("fast prompt") each run and review the prompt plots.
  • (new, Aug 19) Run the Compton DAQ

Taking Data

PREX Collimator (Septum Temperatures)

Magnets

Target

Detectors

Reporting

Parity

Monitoring

Beam Modulation

Re-initializing

Fall 2016 HOWTO


Expert Tools

Setting up Postpan

Setting up japan

Running prompt

Performing Dithering Corrections

Pictures needed