Difference between revisions of "HOW TOs"

From PREX Wiki
Jump to navigationJump to search
Line 101: Line 101:
 
* [[Power_outage_recovery|Recovering from Power Outage]]
 
* [[Power_outage_recovery|Recovering from Power Outage]]
 
* '''OLD''' [[Beam Recovery|Coming back from no beam]]
 
* '''OLD''' [[Beam Recovery|Coming back from no beam]]
 +
* '''NEW''' [[Establishing High Current on a Calcium Target]]
 
* [[DAQ_Checkout_test|Parity DAQ]]
 
* [[DAQ_Checkout_test|Parity DAQ]]
 
* [https://wiki.jlab.org/tegwiki/index.php/Hut_Remote_Power_Map Remote power strips]
 
* [https://wiki.jlab.org/tegwiki/index.php/Hut_Remote_Power_Map Remote power strips]

Revision as of 01:51, 3 March 2020

PREX Main<< Information for Shift Takers << Shift Leader


Overview of Shift Tasks

  • Ask the expert (back room) if something is unclear.
  • Start / stop runs using the Parity DAQ (apar@adaq1). Keep runs <430 K events or ~0.5 hour at 240 Hz.
  • Verify that Charge Asymmetry feedback is running. The data are practically useless if not.
  • Verify that Beam Modulation is running
  • Look at the Panguin ("online analyzer") plots
  • Analyze ("fast prompt") each run and review the prompt plots.
  • (new, Aug 19) Run the Compton DAQ
  • (new, Feb 28) Run the Compton Counting Mode DAQ

Taking Data

PREX Collimator (Septum Temperatures)

Magnets

Target

Detectors

Fast Feedback

Reporting

Parity

Monitoring

Beam Modulation

Re-initializing

Fall 2016 HOWTO


Expert Tools

Setting up Postpan

Setting up japan

Running prompt

Performing Dithering Corrections

Pictures needed