HOW TOs

From PREX Wiki
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PREX Main<< Information for Shift Takers << Shift Leader


Overview of Shift Tasks

  • Ask the expert (back room) if something is unclear.
  • Start / stop runs using the Parity DAQ (apar@adaq1). Keep runs <430 K events or ~0.5 hour at 240 Hz.
  • Verify that Charge Asymmetry feedback is running. The data are practically useless if not.
  • Verify that Beam Modulation is running
  • Look at the Panguin ("online analyzer") plots
  • Analyze ("fast prompt") each run and review the prompt plots.
  • (new, Aug 19) Run the Compton DAQ
  • (new, Feb 28) Run the Compton Counting Mode DAQ

Taking Data

PREX Collimator (Septum Temperatures)

Magnets

Target

Detectors

Fast Feedback

Reporting

Parity

Monitoring

Beam Modulation

Re-initializing

Polarization

Fall 2016 HOWTO


Expert Tools

Setting up Postpan

Setting up japan

Running prompt

Performing Dithering Corrections

Pictures needed